PROJECT TIME CONTROL IN BUILDING CONSTRUCTION
NUMBERS PAGES: 68 RESEARCH TYPE:- PROJECT AMOUNT :- ₦2500
DOWNLOAD PROJECT
ABSTRACT
This research work is to deal with project time control as an important tool in building constructions. It is widely used by contractor’s nation wide which needs to be worked with throughout the life of the project.
A study is carried out to study time control method that can be frequently used by contractors during the construction stage and to identify some problem faced by the contractor in controlling the costs on site. Each building project has to meet the stipulated time.
If project time control is not implemented correctly, it attracts additional cost.
TABLE OF CONTENT
TITLE PAGE —————————————————- i
CERTIFICATION ——————————————— ii
DEDICATION —————————————————– iii
ACKNOWLEDGEMENT ————————————– iv
ABSTRACT —————————————————— v
TABLE OF CONTENT ———————————————– vi
CHAPTER ONE
1.0 INTRODUCTION ———————————————– 1
1.1 BACKGROUND OF THE STUDY ———————— 1
1.2 STATEMENT OF THE STUDY ———————— 3
1.3 OBJECTIVE OF STUDY ——————————– 4
1.4 SCOPE OF THE STUDY ——————————– 6
1.5 SIGNIFICANT OF THE STUDY ———————— 7
CHAPTER TWO
2.0 INTRODUCTION ———————————————– 9
2.1 LITERATURE REVIEW ————————————– 10
2.2 DESCRIPTION OF ON-SITE STATUS —————- 12
2.3 BUILDING PROCESS ————————————— 14
2.4 EVALUATION OF SUB-PROCESS —————- 15
2.5 CONSTRUCTION PROJECT MANAGEMENT ——– 16
2.6 DESIGNS, BID, BUILD, CONTRACTS —————- 18
2.7 CONSTRUCTION PROJECT COSTS —————- 22
2.8 MANUAL HANDLING IN BUILDING AND CONSTRUCTION INDUSTRY ——————————————————- 24
2.9 COST CONTROL MONITORING AND ACCOUNTING — 30
2.10 PROBLEMS OF PROJECT TIME CONTROL ———— 33
CHAPTER THREE
3.0 DATA SOURCE —————————————————- 35
3.1 DOCUMENTS AS INFORMATION SOURCE ————— 35
3.2 INSTRUMENTS FOR DATA EVALUATION ————– 36
3.3 COMBINING PROCESS MODELING AND DATA EVALUATION 38
3.4 CONSTRUCTION METHOD AND DESCRIPTION OF COMPLEX PROCESS ——————————————————————— 39
CHAPTER FOUR
4.0 CURRENT STATUS —————————————— 41
4.1 DATA BASE PRESENTATION AND STATISTICAL INDICATORS 43
4.2 CURVE SHAPE ANALYSIS FOR COMPLETED HIGH-RISK CONSTRUCTION PROJECT ———————————- 43
CHAPTER FIVE
5.0 CONCLUSION ————————————————- 66
5.1 RECOMMENDATION —————————————– 67
5.2 REFERENCES —————————————– 68
2 thoughts on “PROJECT TIME CONTROL IN BUILDING CONSTRUCTION”